Page not found
Unfortunately, the page you are looking for does not exist (anymore). But Zuidas.nl is full of information, try searching in our article archive, via the navigation menu or the search engine.
- Safety awareness at Zuidasdok Safe construction is one of the most important challenges for Zuidasdok. We are building in a busy, built-up area and always in close proximity to the A10 and the railway. So, how do we ensure that it stays safe?
- Night-time traffic disruption on A10 Zuid In the evenings and nights between 27 and 30 March 2024, there will be works happening along the A10 Zuid in the Utrecht direction. This is expected to cause some disruption to traffic. In the night from Friday, 29 to Saturday 30 March, the S108 access road will be closed.
- Parnassusweg closures for construction of metro viaduct From April to July 2024, we are working on the metro viaducts across Parnassusweg. We are making preparations to enable the construction of a new viaduct there this summer. During this period, we will be closing the eastern carriageway (in the direction of the city) several times.
- 148 affordable homes in The Harmony In Beethovenstraat, Zadelhoff is developing the complex ‘The Harmony’, with 63 social rental homes and 85 mid-market rental homes. They will be part of the new Ravel residential district that is set to be built between the new AFC football pitches and De Boelelaan.
- Study into third railway platform at Amsterdam Zuid The Ministry of Infrastructure and Water Management has commissioned ProRail to embark on a so-called ‘planning and study phase’ exploring the options for a future third railway platform for Amsterdam Zuid station. The station currently has two platforms. Zuidasdok is working on the assumption that there will be a third platform.
- Zuidas and Zuidasdok market brings in the crowds On 12 March 2024, more than 150 people visited the market in the Zuidas-Zuidasdok Information Centre. Alongside many familiar faces, there were also quite a lot of new ones. People with specific questions and people with a general interest in Zuidas and Zuidasdok.
- 350 piles for additional station passageway Piles, piles and even more piles. Under the roof of the second passenger tunnel at Amsterdam Zuid station, everything is focusing on foundation work. A total of around 350 piles are being inserted into the ground for the floor of the new Brittenpassage.
- 13 March: meeting about De Nieuwe Meer junction In 2024, the reconstruction of the De Nieuwe Meer junction is set to start after a long period of preparation. At two walk-in meetings on Wednesday 13 March, we will give you an idea of the works you can expect in the years ahead and the related disruption.
- Making space for A10 Zuid widening At the start of March 2024, we will be removing trees and bushes at three locations around the De Nieuwe Meer junction. This will create space for work sites and access roads for construction. Ultimately, this will also enable the widening of the A10 Zuid. Cyclists will face some temporary disruption.
- Zuidas accessibility score declines The average score for journeys to Zuidas fell in 2023 to 6.9 out of 10, the lowest figure in our survey since 2016. The fact that things have become increasingly busy, partly due to works, is the main cause. This is according to the 2023 Mobility Survey.