Fertile soil from Ravelgracht to be reused

In the new Ravel residential district, something extraordinary is happening. To the south of the AFC football pitches, we are digging a canal: Ravelgracht. The fertile soil that we are removing is set to be reused in other places in Amsterdam.

‘Ceci’, 25 apartments next to Stepstone

Alongside the 216 starter homes in Stepstone, Ceci is being built, a complex of 25 private sector apartments with a minimum size of 70 square metres. There will be commercial amenities on the ground floor. Ceci is scheduled for completion by the end of 2026.

Temporary shed for museum tram next to Jachthavenweg

From 2 April until Friday, 28 June, a temporary tram shed is being built for the museum tram next to Jachthavenweg. This is expected to cause some disruption to traffic. Some parking spaces will also be temporarily out of use.

Zuidas accessibility score declines

The average score for journeys to Zuidas fell in 2023 to 6.9 out of 10, the lowest figure in our survey since 2016. The fact that things have become increasingly busy, partly due to works, is the main cause. This is according to the 2023 Mobility Survey.
1

Philips headquarters nears completion

The completion of PI59, in Prinses Irenestraat, is in sight. In less than two years, the contractor has transformed the building from a brutalist bunker to an ultramodern Philips headquarters. It is a truly amazing transformation.

Preliminary design for Beatrixpark site now ready

The area between Kapel & Convict and the AkzoNobel and Stibbe buildings and the St. Nicolaaslyceum will be given a new layout in the next few years. The preliminary design for the public area is now ready. It is set to be green and park-like.

Working together on a vibrant Kenniskwartier

Kenniskwartier (Knowledge District) is developing fast. VU Campus is being regenerated, around 2,700 homes are set to be built and there are new amenities and green areas under development along with a thriving centre for research and education. All of this in what will soon be an amazingly accessible location.

Playground equipment in Beatrixpark to be removed

Between 19 and 23 February 2024, we will be removing the Carve playground equipment from Beatrixpark. It was becoming less of a source of fun and enjoyment and an increasing cause of nuisance. Zuid city district is now considering what will replace it. You are welcome to contribute any ideas you may have.

Wooden head offices for BNP Paribas and Arcadis

On the so-called ‘de Boog‘ plot, construction work has started on The CubeHouse. This will be the new head offices of BNP Paribas Nederland and Arcadis. Remarkably, this office tower, developed by G&S&, will mostly be made out of wood.

Area around new Strawinskyhuis to be relandscaped

From 15 January until Friday, 8 March, we will be relandscaping the public area around the new Strawinskyhuis. As a result, Strawinskypad will become accessible again. There will be some noise disruption, especially during the first week.

2023: the year of shifting and digging

The broad contours of the second passageway at Amsterdam Zuid station became visible. The existing passageway was also renovated. Numerous construction projects were completed. We also put together a great summer party. All of that – and much more – was 2023 in Zuidas.

Emergency department entrance in Amstelveenseweg made safer

In the weekend of 16 and 17 December 2023, we made modifications to the entrance to the emergency department of Amsterdam UMC, location VUmc. The entrance is now wider and easier to navigate, making it much safer, especially for cyclists and pedestrians.