skip to main content
Article archive

Article archive

Selected filters:

Fertile soil from Ravelgracht to be reused

In the new Ravel residential district, something extraordinary is happening. To the south of the AFC football pitches, we are digging a canal: Ravelgracht. The fertile soil that we are removing is set to be reused in other places in Amsterdam.

Temporary shed for museum tram next to Jachthavenweg

From 2 April until Friday, 28 June, a temporary tram shed is being built for the museum tram next to Jachthavenweg. This is expected to cause some disruption to traffic. Some parking spaces will also be temporarily out of use.

Zuidas accessibility score declines

The average score for journeys to Zuidas fell in 2023 to 6.9 out of 10, the lowest figure in our survey since 2016. The fact that things have become increasingly busy, partly due to works, is the main cause. This is according to the 2023 Mobility Survey.

Working together on a vibrant Kenniskwartier

Kenniskwartier (Knowledge District) is developing fast. VU Campus is being regenerated, around 2,700 homes are set to be built and there are new amenities and green areas under development along with a thriving centre for research and education. All of this in what will soon be an amazingly accessible location.

Wooden head offices for BNP Paribas and Arcadis

On the so-called ‘de Boog‘ plot, construction work has started on The CubeHouse. This will be the new head offices of BNP Paribas Nederland and Arcadis. Remarkably, this office tower, developed by G&S&, will mostly be made out of wood.

Emergency department entrance in Amstelveenseweg made safer

In the weekend of 16 and 17 December 2023, we made modifications to the entrance to the emergency department of Amsterdam UMC, location VUmc. The entrance is now wider and easier to navigate, making it much safer, especially for cyclists and pedestrians.

28-11 to 8-12: tram track maintenance in Parnassusweg

From 28 November until 8 December 2023, the GVB will be carrying out maintenance work on the tram track in Parnassusweg. GVB will be working at night on weekdays and night and day during the weekend from 1 to 4 December. Pedestrians, cyclists and car traffic will experience disruption.

Night-time traffic disruption on the A10 In the direction of the A4 Schiphol

In the night of Thursday, 23 and Friday, 24 November, two carriageways will be closed on the A10 In the direction of A4 Schiphol. No diversion will be necessary. During the works, traffic will use a single carriageway.

Safe and green Wielingenstraat completed

On Friday, 20 November work was completed on a safer and greener Wielingenstraat. All the street paving has been replaced and there is a separate cycle path on both sides. There is also a wide, green central reservation.

Changes to emergency department entrance in Amstelveenseweg postponed

Most of the planned works on the entrance to the emergency department at UMC, location VUmc, have now been postponed until after the winter of 2023. The forecast of wet weather means that there is too great a risk of delays and major traffic disruption on the busy Amstelveenseweg.

Safer access to emergency department at Amsterdam UMC-VUmc location

From 3 to 5 November 2023, Amstelveenseweg will be closed in the Amstelveen direction between De Boelelaan and Van Nijenrodeweg. We are making changes to the entrance to the emergency department at Amsterdam UMC-VUmc location in order to improve traffic safety.

Central cycle path to Beatrixpark removed for house-building

Starting on 9 October, we will be removing the cycle path that leads from Beethovenstraat, between the Stibbe and AkzoNobel offices, to Beatrixpark. It runs diagonally across the site on which we will be building housing in the years ahead.
  1. 1
  2. 2
  3. 3
  4. 4
  5. 11
  6. Next