Parnassusweg closed for two weekends in city direction

Because of construction work, Parnassusweg will be closed to cars and buses travelling in the direction of the city in the last weekend of May and first weekend of June 2023. This will be followed in the summer by a two-month road closure for cars travelling out of the city.

Concrete pouring for fifth roof section of Brittenpassage a success

On Wednesday, 12 April 2023, the concrete was poured for the fifth roof section of the new Brittenpassage. The logistics involved meant that there were numerous brief delays in Parnassusweg. Music and chocolate provided a welcome distraction during the waiting time.

17 and 18 December: noise disruption on metro platforms

During the weekend of 17 and 18 December, we will again be inserting box piles into the ground at Amsterdam Zuid station. A total of 20 box piles will be inserted next to the metro platforms. This may cause disruption as a result of vibration and noise.

New shared transport hub in Arnold Schönberglaan

On the south side of the A10, along Arnold Schönberglaan, we have set up a shared transport hub. Travellers will be able to use it to access a shared bike, scooter or car. The hub is a pilot and will be here until 2023.