3 July: meeting to discuss works in Prinses Irenebuurt area

A lot of construction work is taking place between Amsterdam Zuid station and Prinses Irenestraat. In the upcoming period, there will also be works in and around the station. On 3 July 2023, we are organising a walk-in meeting at the Thomaskerk to update you on what is happening.

Suggest ideas (again) for the pocket park next to PI59

Starting on 1 May 2023, we are inviting the local community to suggest ideas for the pocket park between PI59 and law firm Freshfields. During the previous consultations in March, people’s preferences focused on green areas, sport and play. We now want to explore this in more detail. Will you contribute again, by swiping on the app?

Suggest ideas for the pocket park between PI59 and Freshfields

Between PI59, formerly home to the Amsterdam International Community School (AICS), and the law firm Freshfields, we have plans to create a pocket park. We are eager to do this in consultation with the local neighbourhood. Will you contribute your ideas?

Light makes all the difference in regenerated Strawinskyhuis

The old Strawinskyhuis in Prinses Irenestraat is now virtually unrecognisable. At the heart of what was once a brutalist complex, there now lies a bright and airy atrium. The building is not yet fully complete: work on it is expected to last until the end of the year.

Extreme make-over for Philips’ new headquarters

All that remains of the brutalist complex at Prinses Irenestraat 59 is its bare carcase. This 1970s building is being thoroughly refurbished before Philips moves into it in 2025. So, how is construction progressing?

Final PI59 demolition work starts

Since the end of October 2022, there have been sounds of demolition hammers at work in Prinses Irenestraat as the plasterwork and several floors in the former Amsterdam International Community School (AICS) are being demolished. The work will last until mid-December at the latest.

11 July: residents’ evening on WTC masterplan

The owner of the WTC, CBRE IM, has plans to renovate and extend the WTC Amsterdam. A meeting is being held on 11 July 2022 to discuss the plans with local residents. You are welcome to attend in the WTC auditorium.

Pleasant area around WTC’s Tower Ten

WTC’s Tower Ten has now reached such an advanced stage that the contractor is set to hand back the public space to the City of Amsterdam in May. So, what plans do we have for it? We will be adding a range of planting, widening the cycle path and making it an attractive place in which to spend time. We present an initial impression below.

Fresh new look for the Strawinskyhuis: light and open

After six months of demolition work, the contractor du Prie is now ready to start work on the new glass exterior of the Strawinskyhuis. The first plates of glass will soon be put into place. ‘It will be a radical transition – from dark and closed, to light and open.’

Potential WTC extension becomes overall masterplan study

The owner of WTC Amsterdam, CBRE Investment Management, is conducting a masterplan study on the long-term future structure of the entire WTC complex. This means that the extension work on towers A and B will not be happening, at least for now.

2Amsterdam office building completed

With work now finished on the 2Amsterdam office tower, the transformation of one of the oldest buildings in Zuidas is complete. Although the former Twin Towers no longer both serve as offices, they still unmistakably form a single unit.