skip to main content
Article archive

Article archive

Works in old courthouse for upcoming museum

In the future, the former courthouse in Parnassusweg will be home to a museum. The contractor will begin the initial works on it this month: stripping the interior in the part of the building that has protected monument status.

Anti-graffiti tests for Amsterdam Zuid station

We have conducted tests to identify which coating and which removal product will be most effective in combating graffiti at the new Amsterdam Zuid station. We have found a product that most effectively meets our requirements.

Changes to emergency department entrance in Amstelveenseweg postponed

Most of the planned works on the entrance to the emergency department at UMC, location VUmc, have now been postponed until after the winter of 2023. The forecast of wet weather means that there is too great a risk of delays and major traffic disruption on the busy Amstelveenseweg.

Two nights of lifting work in Parnassusweg

In the two nights from Monday 30 October to Wednesday, 1 November, we will be working on the metro viaduct above Parnassusweg. We are doing this at night for safety reasons.

Safer access to emergency department at Amsterdam UMC-VUmc location

From 3 to 5 November 2023, Amstelveenseweg will be closed in the Amstelveen direction between De Boelelaan and Van Nijenrodeweg. We are making changes to the entrance to the emergency department at Amsterdam UMC-VUmc location in order to improve traffic safety.

One metro track closed due to minor subsidence

UPDATE 21 October, 13.00: Since early afternoon on 21 October, the 50 and 51 metro service from Amsterdam Zuid station in the direction of Amsterdam Central Station and Gein has resumed. We are now permanently monitoring the situation.

Complete the Zuid Neighbourhood Questionnaire

What’s going well in Zuidas? What can be improved? You can give your personal view about this and other questions in the 2023 Zuid Neighbourhood Questionnaire. Your answers will help the Zuid city district to understand what you think about what’s going on in your neighbourhood.

Central cycle path to Beatrixpark removed for house-building

Starting on 9 October, we will be removing the cycle path that leads from Beethovenstraat, between the Stibbe and AkzoNobel offices, to Beatrixpark. It runs diagonally across the site on which we will be building housing in the years ahead.

Be the first to walk through the new Brittenpassage

On Wednesday, 11 October 2023, we are organising something very special. For the first time ever, you have an opportunity to take a look around the additional passenger tunnel at Amsterdam Zuid station: the Brittenpassage. It promises to be an impressive journey underneath the A10, the trains and metros.

Rapid rise of The Pulse is all thanks to prefab

In the space of 18 months, The Pulse of Amsterdam has been transformed from a construction pit to an eyecatcher in the making. Alongside the A10, the two towers in this megaproject have shot out of the ground like mushrooms. Time for an update on construction progress.

Laying of Maurice Ravellaan for new Ravel district

Starting in September 2023, we will spend a year working on the entrance to the new Ravel residential district: Maurice Ravellaan, with space for pedestrians, cyclists and plenty of green areas. We are also digging an actual canal, complete with bridges to the AFC sports fields.

Consultation opens on draft zoning plan for Fred. Roeskestraat 55

On the site of the former temporary courthouse at Fred. Roeskestraat 55, there are plans to develop a building with offices and housing. The draft zoning plan for this development is now open for consultation until 18 October 2023. A walk-in evening has been scheduled for 21 September.
  1. Previous
  2. 1
  3. 2
  4. 3
  5. 4
  6. 5
  7. 6
  8. 28
  9. Next