- Ravelly
- Are you ready for the eight-day closure of the A10 Zuid? There’s not long to go now: from the evening of Saturday, 5 August until the morning of Monday, 14 August, the A4 and A10 Zuid will be closed from the Badhoevedorp interchange to the S109 RAI access road. We are certainly ready for it. But is everybody else in Zuidas?
- Amstel interchange
- A10 Zuid in the direction of Schiphol closed for two weekends For two weekends in September 2023, there will be major traffic disruption on the south side of Amsterdam. Between 8 and 11 September and between 22 and 25 September, the A10 Zuid in the direction of Schiphol and The Hague will be closed from the Amstel interchange to the S108 VUmc access road.
- Don’t miss the Zuidas Zomer Keet Starting on 20 July 2023, the Zuidas Zomer Keet (Zuidas Summer Shack) will be back in Gustav Mahlerplein. In it, we’ll tell you all about the summer works at Amsterdam Zuid station, but there’s also much more: guided tours, workshops and tuktuk rides. Make sure you don’t miss it!
- Reminder: A4 and A10 Zuid closed for eight days in August 2023 From Saturday, 5 August until the morning of Monday, 14 August, there will be major traffic disruption on the south side of Amsterdam. For an eight-day period, the A4 and A10 Zuid will be closed from the Badhoevedorp interchange to the S109 RAI exit because of work on Amsterdam Zuid station.
- Replacement of Rozenoordbrug to be part of Zuidasdok project The replacement of the southern Rozenoordbrug on the A10 Zuid will be part of the reconstruction of the Amstel interchange, one of the Zuidasdok projects. ‘The city of Amsterdam is developing. We need to be sure we have the capacity to keep pace with it.’
- 1 July: installing sheet piles at Amsterdam Zuid station In the last week of June 2023, we had to halt sheet piling work west of Amsterdam Zuid station due to the instability of the metro track. We will complete the work on Saturday 1 July, after which we will repair the track.
- Who will win the 2023 Zuidas Sustainability Award? Has your organisation set up or completed an inspiring sustainable initiative since March 2022? If so, register the project by 1 August 2023 and compete for the Zuidas Sustainability Award. An expert panel of judges will choose the winners in November.
- A10 Zuid to get slight bend after summer works Between 5 and 14 August 2023, the A4 and A10 Zuid will be closed for a period of eight days. After that, we will build the A10 back with a small ‘meander’ slightly to the south. This will create space to widen the most southerly railway platform at Amsterdam Zuid station.