On Friday, 30 January 2026, between 09.00 and 16.30, three heavy transports will drive from the Jaagpad to the work site of construction consortium TriAX on Riekerweg (opposite Hotdog House). The transports will travel at walking pace with a maximum speed of 5 kilometers per hour. The route over public roads is approximately 375 meters. Each transport is expected to take 20 to 30 minutes. Traffic controllers will ensure that road users are guided past the transports – if this is safe to do so.
Between 26 September 2025 and 8 June 2026, there will be several heavy transports with parts for the new fly-over at the De Nieuwe Meer junction.
