skip to main content

On 14 October 2025, between 09.00 and 16.30, two heavy transports will travel from Riekerweg to Anthony Fokkerweg via Vliegtuigstraat – route 1 (see map). The transports will travel at walking pace with a maximum speed of 5 kilometers per hour. The route is approximately 1 km on public roads. Each transport is expected to take 60 to 70 minutes. Traffic controllers will ensure that road users are guided past the transports – if this is safe. Between the Jaagpad and Anthony Fokkerweg, it is easier to choose an alternative route.

Between 26 September 2025 and 8 June 2026, there will be several heavy transports with parts for the new fly-over at the De Nieuwe Meer junction.