UPDATE March 20, 2026 We have moved the lifting work from an earlier weekend to the weekend of Friday, March 27. We need extra time for this, so the connection from the A10 South to the A10 West Leeuwarden/Zaanstad will remain closed until 5 a.m. on Monday, March 30.
Please allow for an additional travel time of 10 to 30 minutes.
Works
During the weekend from Friday March 27 to Monday March 30 we will do preparatory work for the extra bridge that we are building on the north side of the Schinkel Bridge. We also carry out lifting work for the new fly-over that connects the A10 South with the A4 towards Schiphol/Rotterdam.
Closed
- Road connecting the A10 Zuid to the A10 West in the direction of Leeuwarden/Zaanstad
- One lane on the A4 in the direction of Schiphol (the far-right lane)
Open
- A4 in both directions
- A10 Zuid in both directions
- A10 West in the direction of the A4 Schiphol
- A10 Zuid in the direction of the A1 Hengelo/A2 Utrecht
- Road connecting the A4 to the A10 West in the direction of Leeuwarden/Zaanstad
Diversion
A9/A4 or A10 North
Travel advice
Share article:

Give your opinion
Get in touch with us