The Strawinskyhuis, Prinses Irenestraat 39-43, is being transformed into a new, state-of-the-art office building. Principal contractor du Prie bouw & ontwikkeling b.v. is responsible for coordinating and realising this large-scale renovation. The work started in July 2021. It is scheduled for completion by March 2023. Du Prie has been commissioned by Strawinskyhuis B.V., an alliance between FLOW and Egeria Real Estate Development.
Thorough refurbishment
The Strawinskyhuis dates back to the 1970s and requires thorough refurbishment. The contractor is completely stripping the building. The existing structural grid and framework will remain in place, as will the existing floors. However, the building will be given a completely new façade. The design by architects firm ZZDP creates a state-of-the-art office building featuring flexible and transparent office floors, spread across four layers. The building will also have a patio and atrium. The adjoining two-storey car park is also being renovated.




Specifications
- Gross floor area: 10,587 sq. m
- Office space: 6,141 sq. m.
- Conference facilities: 1,681 sq. m.
- Underground car park: 1,004 sq. m
- Underground bicycle parking facility: 137 sq. m.
Sustainability
The new office will comply with the latest sustainability standards. This includes the use of sustainable materials and solar panels and a thermal energy storage system using a heat pump. The aim is to achieve BREEAM Excellent certification.



Schedule
Demolition work will last until the end of 2021. Renovation work on the structure, façade and roof will then start. Finishing work is scheduled for completion in February 2023 and the construction site and diversions are expected to be removed in March 2023.



Logistics
During the renovations, construction traffic will make only minimum use of Prinses Irenestraat, in order to prevent disruption to this residential neighbourhood as far as possible. A special ramp for construction traffic has been put in place starting in Strawinskylaan.
During the works
The works will take place between around 07.00 and 16.00. The contractor has promised to minimise any noise nuisance and keep the site clean and safe. The transportation of materials etc., will take place outside peak periods: i.e., not between 08.00 and 09.30 or 16.00 and 17.30. Traffic controllers will be on hand at times of major transports.
More information
For more information, see the du Prie project page.

![20230417 Strawinskyhuis Amaliaplein [marcel steinbach]15](https://farm66.staticflickr.com/65535/52904646038_29e97fcf94.jpg)

![20230417 PI59 [marcel steinbach]14](https://farm66.staticflickr.com/65535/52904198131_08cdcfb9fa.jpg)


![20230417 Strawinskyhuis [marcel steinbach]](https://farm66.staticflickr.com/65535/52904645928_e73e129114.jpg)

![20230417 Strawinskyhuis [marcel steinbach]10](https://farm66.staticflickr.com/65535/52904582805_bdc9ae89af.jpg)
![20230417 Strawinskyhuis [marcel steinbach]9](https://farm66.staticflickr.com/65535/52904358329_f6b4cd0b67.jpg)
![20230417 Strawinskyhuis [marcel steinbach]8](https://farm66.staticflickr.com/65535/52904647638_a15e898384.jpg)

![20230417 Strawinskyhuis [marcel steinbach]7](https://farm66.staticflickr.com/65535/52904359009_9d8dcd0465.jpg)

![20230417 Strawinskyhuis [marcel steinbach]6](https://farm66.staticflickr.com/65535/52904648398_c76d28a606.jpg)

![20230417 Amaliaplein [marcel steinbach]5](https://farm66.staticflickr.com/65535/52904583425_b967a5b4ef.jpg)

![20230417 Strawinskyhuis [marcel steinbach]4](https://farm66.staticflickr.com/65535/52904583995_5dc55239eb.jpg)

![20230417 Strawinskyhuis [marcel steinbach]3](https://farm66.staticflickr.com/65535/52904201436_215780cca0.jpg)


![20230417 Strawinskyhuis [marcel steinbach]1](https://farm66.staticflickr.com/65535/52904201536_c6e93f3c3a.jpg)

In images
A selection of images. The full archive of images is available in our image bank.
See all images