skip to main content
Article archive

Article archive

reizen-en

Roof section for extra passageway under Amsterdam Zuid now in place

It was an exciting weekend. Thousands of people were watching in person or on the webcams, at times teetering between hope and trepidation. But the operation was a success. The first roof section for the extra passenger tunnel is now in place.

Five weekends for a slab of concrete?

During Whit weekend (8-10 June 2019), we will be putting the first part of the roof of the new Brittenpassage into position. But this mammoth task will be affecting travellers from as early as Friday, 10 May 2019. So what is all the work that needs to be done?
reizen-en

Road closures on A10 orbital motorway at night

At the end of October and throughout November, roadworks will be conducted at night on and alongside the southern stretch of the A10 orbital motorway (A10 Zuid). As a result, some lanes, connecting roads and slip roads may be closed between 23:00 and 05:00. In such cases, traffic will be diverted. The work will begin on Tuesday 30 October.

From resident wishes to sketches for street design

What to do with the public space in three side-streets of the George Gershwinlaan? The residents have been talking about this via an app since April 2018. On 22 September 2018 they gathered in the street and met with the Zuidas designers.
werken-en

The Council of State is once again considering various objections to the Zuidasdok Routing Decision

On 3 May 2018, the Council of State considered two objections to the Routing Decision for the Zuidasdok project. Due to these objections, this Routing Decision is not yet irrevocable.
  1. Previous
  2. 1
  3. 19
  4. 20
  5. 21
  6. 22