skip to main content
Article archive

Article archive

A10 Zuid to close for eight weekends in 2024

Between the end of June and mid-December 2024, Zuidasdok will be closing the A10 Zuid for eight weekends. These closures will cause serious traffic disruption and increased journey times. We are giving you advance information about these works and the potential diversions.

Three-day trial for limited access to Minervapassage

On 16, 17 and 18 April 2024, we have closed off one of the two southern access tunnels of the Minervapassage. We are doing this in order to gain an impression of what will happen when the passageway is partially closed for a longer period from mid-2025.

Working in the ‘crawlspace’ of the Brittenpassage

The digging of the second passenger tunnel at Amsterdam Zuid station, the Brittenpassage, is now three-quarters of the way towards completion. Concrete trucks are currently in the process of creating a crawlspace. They are also preparing the foundations for the pillars that will support the roof of the passageway.

Guided tour of works at Amsterdam Zuid station

Are you curious about what we are building in and around Amsterdam Zuid station? At 16.00 on Tuesday, 16 April 2024, we are organising a guided tour of all of the works. This walking tour will include a look at the additional passenger tunnel, the Brittenpassage.

Safety awareness at Zuidasdok

Safe construction is one of the most important challenges for Zuidasdok. We are building in a busy, built-up area and always in close proximity to the A10 and the railway. So, how do we ensure that it stays safe?

Night-time traffic disruption on A10 Zuid

In the evenings and nights between 27 and 30 March 2024, there will be works happening along the A10 Zuid in the Utrecht direction. This is expected to cause some disruption to traffic. In the night from Friday, 29 to Saturday 30 March, the S108 access road will be closed.

Parnassusweg closures for construction of metro viaduct

From April to July 2024, we are working on the metro viaducts across Parnassusweg. We are making preparations to enable the construction of a new viaduct there this summer. During this period, we will be closing the eastern carriageway (in the direction of the city) several times.

Study into third railway platform at Amsterdam Zuid

The Ministry of Infrastructure and Water Management has commissioned ProRail to embark on a so-called ‘planning and study phase’ exploring the options for a future third railway platform for Amsterdam Zuid station. The station currently has two platforms. Zuidasdok is working on the assumption that there will be a third platform.

Zuidas and Zuidasdok market brings in the crowds

On 12 March 2024, more than 150 people visited the market in the Zuidas-Zuidasdok Information Centre. Alongside many familiar faces, there were also quite a lot of new ones. People with specific questions and people with a general interest in Zuidas and Zuidasdok.

350 piles for additional station passageway

Piles, piles and even more piles. Under the roof of the second passenger tunnel at Amsterdam Zuid station, everything is focusing on foundation work. A total of around 350 piles are being inserted into the ground for the floor of the new Brittenpassage.

13 March: meeting about De Nieuwe Meer junction

In 2024, the reconstruction of the De Nieuwe Meer junction is set to start after a long period of preparation. At two walk-in meetings on Wednesday 13 March, we will give you an idea of the works you can expect in the years ahead and the related disruption.

Making space for A10 Zuid widening

At the start of March 2024, we will be removing trees and bushes at three locations around the De Nieuwe Meer junction. This will create space for work sites and access roads for construction. Ultimately, this will also enable the widening of the A10 Zuid. Cyclists will face some temporary disruption.
  1. 1
  2. 2
  3. 3
  4. 4
  5. 19
  6. Next