Article archive
Selected filters:
The VU Research Building in De Boelelaan was completed in early 2024. It is an extraordinary building and the reason why only really becomes clear when you look inside it. ‘Even the tiniest vibrations and temperature differences can have an effect on measurements.’
Alongside the 216 starter homes in Stepstone, Ceci is being built, a complex of 25 private sector apartments with a minimum size of 70 square metres. There will be commercial amenities on the ground floor. Ceci is scheduled for completion by the end of 2026.
On 12 March 2024, more than 150 people visited the market in the Zuidas-Zuidasdok Information Centre. Alongside many familiar faces, there were also quite a lot of new ones. People with specific questions and people with a general interest in Zuidas and Zuidasdok.
Between 7 July and 26 August 2024, the metros at Amsterdam Zuid station will run a modified service. Metros 50 and 51 will be using a single track instead of two, in both directions. The GVB's Ger Walstra tells us about it.
The completion of PI59, in Prinses Irenestraat, is in sight. In less than two years, the contractor has transformed the building from a brutalist bunker to an ultramodern Philips headquarters. It is a truly amazing transformation.
The area between Kapel & Convict and the AkzoNobel and Stibbe buildings and the St. Nicolaaslyceum will be given a new layout in the next few years. The preliminary design for the public area is now ready. It is set to be green and park-like.
Kenniskwartier (Knowledge District) is developing fast. VU Campus is being regenerated, around 2,700 homes are set to be built and there are new amenities and green areas under development along with a thriving centre for research and education. All of this in what will soon be an amazingly accessible location.
On the so-called ‘de Boog‘ plot, construction work has started on The CubeHouse. This will be the new head offices of BNP Paribas Nederland and Arcadis. Remarkably, this office tower, developed by G&S&, will mostly be made out of wood.
The broad contours of the second passageway at Amsterdam Zuid station became visible. The existing passageway was also renovated. Numerous construction projects were completed. We also put together a great summer party. All of that – and much more – was 2023 in Zuidas.
All kinds of things are happening at the same time on the south side of Amsterdam. We are interested in hearing your views about it and what you think about the way we keep you updated. That's why we kindly request 10 minutes of your time to fill out a survey on this.
The accommodation of around 100 Ukrainian refugees in Kapel & Convict will not begin until April 2024, three months later than planned. Because the location is part of the so-called Main Green Space Infrastructure ('Hoofdgroenstructuur'), the renovation work required explicit approval from Amsterdam City Council.
The Kop Zuidas neighbourhood is almost complete. There are still two more plots to be developed, but work on them will not start until 2026 at the earliest. In the meantime, they are to be given attractive temporary landscaping. Do you have any suggestions on what it should look like?