skip to main content
Article archive

Article archive

One metro track closed due to minor subsidence

UPDATE 21 October, 13.00: Since early afternoon on 21 October, the 50 and 51 metro service from Amsterdam Zuid station in the direction of Amsterdam Central Station and Gein has resumed. We are now permanently monitoring the situation.

First visitors to Brittenpassage can hardly believe their eyes

The big day finally arrived on 11 October 2023. For the first time ever, interested parties had an opportunity to take a walk through the future Brittenpassage, the additional passageway at Amsterdam Zuid station. Here’s an impression of what they saw.

Complete the Zuid Neighbourhood Questionnaire

What’s going well in Zuidas? What can be improved? You can give your personal view about this and other questions in the 2023 Zuid Neighbourhood Questionnaire. Your answers will help the Zuid city district to understand what you think about what’s going on in your neighbourhood.

Preparatory work on A10 Zuid in Van Beinumstraat

From 16 October 2023 until Christmas, part of Eduard van Beinumstraat (next to Wagamama restaurant) will be transformed temporarily into a construction site. We are clearing the area underground to enable the construction of the northern motorway tunnel.

Dig-dig-dig for extra station passageway

After years of construction away from public view, the digging has started for the passenger tunnel at Amsterdam Zuid station: the Brittenpassage. We are removing 50,000 cubic metres of sand from underneath the A10, metro and railway tracks. And the site is spectacular to behold.

Be the first to walk through the new Brittenpassage

On Wednesday, 11 October 2023, we are organising something very special. For the first time ever, you have an opportunity to take a look around the additional passenger tunnel at Amsterdam Zuid station: the Brittenpassage. It promises to be an impressive journey underneath the A10, the trains and metros.

Rapid rise of The Pulse is all thanks to prefab

In the space of 18 months, The Pulse of Amsterdam has been transformed from a construction pit to an eyecatcher in the making. Alongside the A10, the two towers in this megaproject have shot out of the ground like mushrooms. Time for an update on construction progress.

Consultation opens on draft zoning plan for Fred. Roeskestraat 55

On the site of the former temporary courthouse at Fred. Roeskestraat 55, there are plans to develop a building with offices and housing. The draft zoning plan for this development is now open for consultation until 18 October 2023. A walk-in evening has been scheduled for 21 September.

Removing greenery from De Nieuwe Meer interchange

During the preparations for the reconstruction of the De Nieuwe Meer interchange, we have been able to conduct soil surveys without any hindrance. But from the end of August 2023, there will be no way of avoiding it: in order to conduct further surveys and investigations, we need to remove the plants.

‘Surely, we’re here to help each other’

Henk Appels will shortly be standing down as Building Manager at the Atrium in Strawinskylaan. He sees a Zuidas that is becoming increasingly busy: homes are being built, and there will be a tunnel and a new passageway in the future. ‘Ultimately, we all need to work together.’

Reminder: A10 Zuid closed in the direction of Schiphol for two weekends

For two weekends in September 2023, there will be major traffic disruption on the south side of Amsterdam. Between 8 and 11 September and between 22 and 25 September, the A10 Zuid in the direction of Schiphol and The Hague will be closed from the Amstel interchange to the S108 VUmc access road.

New Zuidas cultural events subsidy scheme

Are you interested in organising a film festival, theatre production or concert in Zuidas? It could be possible thanks to a new subsidy scheme especially for cultural events. Private individuals and professional organisers can apply at any time during the year.
  1. Previous
  2. 1
  3. 2
  4. 3
  5. 4
  6. 5
  7. 6
  8. 7
  9. 26
  10. Next