skip to main content
Article archive

Article archive

Selected filters:

A10 Zuid to close for eight weekends in 2024

Between the end of June and mid-December 2024, Zuidasdok will be closing the A10 Zuid for eight weekends. These closures will cause serious traffic disruption and increased journey times. We are giving you advance information about these works and the potential diversions.

A glimpse inside low-vibration VU Research Building

The VU Research Building in De Boelelaan was completed in early 2024. It is an extraordinary building and the reason why only really becomes clear when you look inside it. ‘Even the tiniest vibrations and temperature differences can have an effect on measurements.’

Three-day trial for limited access to Minervapassage

On 16, 17 and 18 April 2024, we have closed off one of the two southern access tunnels of the Minervapassage. We are doing this in order to gain an impression of what will happen when the passageway is partially closed for a longer period from mid-2025.

Working in the ‘crawlspace’ of the Brittenpassage

The digging of the second passenger tunnel at Amsterdam Zuid station, the Brittenpassage, is now three-quarters of the way towards completion. Concrete trucks are currently in the process of creating a crawlspace. They are also preparing the foundations for the pillars that will support the roof of the passageway.

Safety awareness at Zuidasdok

Safe construction is one of the most important challenges for Zuidasdok. We are building in a busy, built-up area and always in close proximity to the A10 and the railway. So, how do we ensure that it stays safe?

Night-time traffic disruption on A10 Zuid

In the evenings and nights between 27 and 30 March 2024, there will be works happening along the A10 Zuid in the Utrecht direction. This is expected to cause some disruption to traffic. In the night from Friday, 29 to Saturday 30 March, the S108 access road will be closed.

Parnassusweg closures for construction of metro viaduct

From April to July 2024, we are working on the metro viaducts across Parnassusweg. We are making preparations to enable the construction of a new viaduct there this summer. During this period, we will be closing the eastern carriageway (in the direction of the city) several times.

13 March: meeting about De Nieuwe Meer junction

In 2024, the reconstruction of the De Nieuwe Meer junction is set to start after a long period of preparation. At two walk-in meetings on Wednesday 13 March, we will give you an idea of the works you can expect in the years ahead and the related disruption.

Making space for A10 Zuid widening

At the start of March 2024, we will be removing trees and bushes at three locations around the De Nieuwe Meer junction. This will create space for work sites and access roads for construction. Ultimately, this will also enable the widening of the A10 Zuid. Cyclists will face some temporary disruption.

12 March: market at our Information Centre

Although there will be nothing on sale, it will definitely be worth the effort coming along to our Information Centre in the WTC on tuesday 12 March 2024. At our market, you will have an opportunity to see, hear about and experience some of the major developments in your neighbourhood. You can even do some speed-dating.
1

Philips headquarters nears completion

The completion of PI59, in Prinses Irenestraat, is in sight. In less than two years, the contractor has transformed the building from a brutalist bunker to an ultramodern Philips headquarters. It is a truly amazing transformation.

Summer weekend closure of A10 Zuid in Schiphol direction

From 12 to 15 July 2024, the A10 Zuid in the direction of Schiphol will be closed for a whole weekend from the Amstel interchange to the S108 Amstelveenseweg access road. This marks the start of six full weeks of work at Amsterdam Zuid station. This year will see several road closures.
  1. 1
  2. 2
  3. 3
  4. 4
  5. 9
  6. Next