skip to main content
Article archive

Article archive

Guided tour of works at Amsterdam Zuid station

Are you curious about what we are building in and around Amsterdam Zuid station? At 16.00 on Tuesday, 16 April 2024, we are organising a guided tour of all of the works. This walking tour will include a look at the additional passenger tunnel, the Brittenpassage.

Summer 2024: reduced metro service at Amsterdam Zuid station

Between 7 July and 26 August 2024, the metros at Amsterdam Zuid station will run a modified service. Metros 50 and 51 will be using a single track instead of two, in both directions. The GVB's Ger Walstra tells us about it.

1 February: new Service & Tickets desk opens

On Thursday, 1 February 2024, the new GVB Service & Tickets desk in the existing passageway at Amsterdam Zuid station will open. The existing desk has to be removed to make space for the renovation of the passageway.

A dive into the world of sheet pile walls

In Zuidas, we are building quite a lot of construction pits, often surrounded by steel sheet pile walls. But not all these walls are the same. The method used to drive a sheet pile into the ground can also vary according to the location. We take a look at how it all works.

Contractor Nieuw-Zuid to continue with next phase of station regeneration

The Nieuw-Zuid construction consortium (Mobilis, Boskalis, Van Gelder) has officially been given the go-ahead for the next phase of the regeneration of Amsterdam Zuid station. This will involve widening and raising the height of the existing station passageway (the Minervapassage) and making modifications to the railway platforms.

Limited access at Amsterdam Zuid station for two weekends

In the weekends of 9-10 and 23-24 September 2023, there will be disruption for travellers wishing to access the metro or railway from Zuidplein. The station entrance will be closed for up to 10 minutes on a regular basis (every two hours). There will also be noise disruption.

Nine days of work on the metro at Amsterdam Zuid station

From Saturday, 19 until Sunday, 27 August, we are working on one of the metro platforms at Amsterdam Zuid station. This is creating space for the renovation of the existing station passageway. For a nine-day period, the metro will run a modified service.

New Service & Tickets desk in station passageway

Starting on 14 August 2023, we are building new temporary accommodation for the GVB Service & Tickets desk in the existing passenger tunnel at Amsterdam Zuid station. The existing desk has to be removed to make space for the renovation of the passageway.

Part of new roof Minervapassage now in place

During the night of 9-10 June 2023, we moved the first roof section for the existing passageway at Amsterdam Zuid station around 114 m to the east. The huge sheet of concrete is now well and truly in position. We take a look back at the process.

9 to 11 June: another diversion in station passageway

In the Minervapassage, the existing entrance to Amsterdam Zuid station, we are replacing the roof. In the evening of 9 June 2023, we will be moving a section of the new roof into position. This means that there will be another diversion in the passageway from 9 until 11 June.

9 June: Amsterdam Zuid station to get new roof

Starting on the evening of Friday, 9 June, Amsterdam Zuid station will be the scene of a spectacle. We are moving a gigantic section of the new roof for the station entrance – the Minervapassage – into position. And you can come and watch the operation in person. All you need to do is register.

Major works in passageway at Amsterdam Zuid station

In 2023, we are hard at work renovating the existing passenger tunnel at Amsterdam Zuid station: the Minervapassage. In the future, it will be much taller and wider than it is now. We are starting by renovating part of the roof.
  1. 1
  2. 2
  3. Next