Article archive
Selected filters:
The waste containers in Wielingenstraat are being replaced and immediately repositioned. At the moment, there are three containers in two different locations, but these will be replaced by five containers next to each other, between Eendrachtstraat and Krammerstraat.
The plans for the construction of 500 to 600 homes on the current site of the Sporthallen Zuid sports complex have been modified. This is because of a change in the schedule for the new accommodation for the Sporthallen Zuid.
On 19 January 2022, developer Breevast is organising an information meeting about the planned housing construction on one of the plots next to Beatrixpark: plot 6/7. The architect and landscape architect will both attend the meeting.
In 2020 or 2021, did you develop or implement a sustainable project, place one in the spotlight or enable one to grow in some other way? If so, why not compete for the first Zuidas Sustainability Award? An expert judging panel will assess the entries.
The owner of WTC Amsterdam, CBRE Investment Management, is conducting a masterplan study on the long-term future structure of the entire WTC complex. This means that the extension work on towers A and B will not be happening, at least for now.
On Tuesday, 28 September, Amsterdam Zuidas organised the Green Walk through Verdi. With around 45 local residents, we took a walk through the area and discussed the Verdi Green Plan ('Groenplan Verdi').
Valley is now virtually complete. Developer EDGE and the Valley construction consortium have successfully built a multifunctional building that will give Zuidas a new look. Hundreds of construction workers have spent around three and a half years working on it. Below is a visual retrospective.
Valley, the iconic building that is nearing completion, is an architectural tour de force. Digital computer models have made a vital contribution to that. Arup subjected the design to tests that included such factors as daylight, hours of sun and privacy.
The renovation work on Europaplein-Oost, opposite the RAI, will be starting on 8 November 2021. Before it can be relandscaped, some things will need to be removed. By the summer of 2022, the neighbourhood will have a new green area to enjoy.
After a year of construction, the steel structure of EDGE Stadium – the former headquarters of Loyens & Loeff – is now as solid as a rock. This means that the finishing work on the new floors can now start, a key part of the building’s upgrade.
The very last plot in the Mahler neighbourhood, in the heart of Zuidas, will have an office building built on it. By mid-2024, BNP Paribas Nederland, Arcadis and G&S Vastgoed will jointly have a sustainable head office on the plot: CubeHouse. The three parties are developing the building themselves.
A milestone for Tripolis Park: the exterior of the building is now more or less completed and all square metres of office accommodation have been let. The contractor is now working on the interior. In this, sustainability is a very important factor.