skip to main content
Article archive

Article archive

Central cycle path to Beatrixpark removed for house-building

Starting on 9 October, we will be removing the cycle path that leads from Beethovenstraat, between the Stibbe and AkzoNobel offices, to Beatrixpark. It runs diagonally across the site on which we will be building housing in the years ahead.

5 to 17 June: works in Prinses Irenestraat

From 5 to 17 June 2023, we are digging test trenches at different locations in Prinses Irenestraat. Our aim is to map out the underground cables and pipelines. Car traffic will be diverted and we expect some noise nuisance.

Construction traffic to access Kapel & Convict via pontoon

Work is currently in progress on Kapel & Convict in Beatrixpark to prepare for the accommodation of 100 Ukrainian refugees at the end of this year. From the 31 May 2023, construction traffic will be able to access the site by means of a pontoon floating in the pond. This will ensure that the busy cycle path remains free.

Suggest ideas (again) for the pocket park next to PI59

Starting on 1 May 2023, we are inviting the local community to suggest ideas for the pocket park between PI59 and law firm Freshfields. During the previous consultations in March, people’s preferences focused on green areas, sport and play. We now want to explore this in more detail. Will you contribute again, by swiping on the app?

Minervabrug: bridge closed for three months for repairs

Starting on 3 April, the bridge for cyclists and pedestrians that connects Zuidas with the Zuid city district will be closed for a three-month period. The Minervabrug is in poor condition and will be repaired. Cyclists and pedestrians will be able to cross the Zuider Amstelkanaal in Beethovenstraat.

Suggest ideas for the pocket park between PI59 and Freshfields

Between PI59, formerly home to the Amsterdam International Community School (AICS), and the law firm Freshfields, we have plans to create a pocket park. We are eager to do this in consultation with the local neighbourhood. Will you contribute your ideas?

Light makes all the difference in regenerated Strawinskyhuis

The old Strawinskyhuis in Prinses Irenestraat is now virtually unrecognisable. At the heart of what was once a brutalist complex, there now lies a bright and airy atrium. The building is not yet fully complete: work on it is expected to last until the end of the year.

Beethovenstraat cycle path next to WTC reopens

The cycle path in Beethovenstraat that runs along the front of the WTC has been open again since 17 March 2023, to the delight of many people. It had been closed for five years to enable the construction of Tower Ten, the newest WTC tower.

Public space around Tower Ten almost ready

From 13 March until 5 May 2023, we will be completing the work on the public space around WTC Tower Ten. This will include adding an illuminated footpath between Strawinskylaan and Beethovenstraat. In the final week, there will be some traffic disruption.

Extreme make-over for Philips’ new headquarters

All that remains of the brutalist complex at Prinses Irenestraat 59 is its bare carcase. This 1970s building is being thoroughly refurbished before Philips moves into it in 2025. So, how is construction progressing?

Work starts in preparation for A10 Zuid tunnel

On Saturday, 25 February, we will be removing a tree in Zuidplein, next to Eduard van Beinumstraat. This is necessary because we will be building the northern motorway tunnel here in the future. Before we can do that, we first need to ensure that the ground underneath is clear of obstacles.

Nature-inclusive housing at Beatrixpark

Right next to Beatrixpark, KondorWessels Vastgoed is developing 94 homes. The residential building, named Habitat Royale, aims to provide good quality accommodation for all its residents: people, flora and fauna. Construction starts in the third quarter of 2024.
  1. 1
  2. 2
  3. 3
  4. Next