skip to main content
Article archive

Article archive

Selected filters:

28-11 to 8-12: tram track maintenance in Parnassusweg

From 28 November until 8 December 2023, the GVB will be carrying out maintenance work on the tram track in Parnassusweg. GVB will be working at night on weekdays and night and day during the weekend from 1 to 4 December. Pedestrians, cyclists and car traffic will experience disruption.

Night-time traffic disruption on the A10 In the direction of the A4 Schiphol

In the night of Thursday, 23 and Friday, 24 November, two carriageways will be closed on the A10 In the direction of A4 Schiphol. No diversion will be necessary. During the works, traffic will use a single carriageway.

Safe and green Wielingenstraat completed

On Friday, 20 November work was completed on a safer and greener Wielingenstraat. All the street paving has been replaced and there is a separate cycle path on both sides. There is also a wide, green central reservation.

119 new student flats in Kenniskwartier

In a few years’ time, 119 student flats are set to be developed in Kenniskwartier (Knowledge District). Housing association DUWO and the City of Amsterdam signed an agreement to that effect on 9 November 2023. Work is now in progress on the details of the design.

Changes to emergency department entrance in Amstelveenseweg postponed

Most of the planned works on the entrance to the emergency department at UMC, location VUmc, have now been postponed until after the winter of 2023. The forecast of wet weather means that there is too great a risk of delays and major traffic disruption on the busy Amstelveenseweg.

Safer access to emergency department at Amsterdam UMC-VUmc location

From 3 to 5 November 2023, Amstelveenseweg will be closed in the Amstelveen direction between De Boelelaan and Van Nijenrodeweg. We are making changes to the entrance to the emergency department at Amsterdam UMC-VUmc location in order to improve traffic safety.

Social (senior citizens’) housing in Fred. Roeskestraat

On the former site of the British School of Amsterdam, housing association Eigen Haard is set to develop two separate buildings that will provide both social housing and homes for the elderly. An information evening was held on 28 September to update the local neighbourhood.

Central cycle path to Beatrixpark removed for house-building

Starting on 9 October, we will be removing the cycle path that leads from Beethovenstraat, between the Stibbe and AkzoNobel offices, to Beatrixpark. It runs diagonally across the site on which we will be building housing in the years ahead.

Tender launched for housing in Kenniskwartier

On 2 October 2023, the tender procedure for a housing construction project in the Kenniskwartier (Knowledge District) was launched. Next to the still to be constructed Jaddanbaikade canal and Florence Pricehof, there are plans for 25 private-sector homes, with space for hospitality/catering on the ground floor.

Rapid rise of The Pulse is all thanks to prefab

In the space of 18 months, The Pulse of Amsterdam has been transformed from a construction pit to an eyecatcher in the making. Alongside the A10, the two towers in this megaproject have shot out of the ground like mushrooms. Time for an update on construction progress.

Laying of Maurice Ravellaan for new Ravel district

Starting in September 2023, we will spend a year working on the entrance to the new Ravel residential district: Maurice Ravellaan, with space for pedestrians, cyclists and plenty of green areas. We are also digging an actual canal, complete with bridges to the AFC sports fields.

Finishing touches added to The Newton

It will not be very long before The Newton is completed in Kop Zuidas. When it comes to the appearance and quality of this energy-efficient complex, it is obvious that no expense has been spared. ‘This is genuine craftsmanship: in no way is this standard housing construction.’
  1. Previous
  2. 1
  3. 2
  4. 3
  5. 4
  6. 5
  7. 10
  8. Next