Zuidas to create space for walking, cycling and public transport

The Sustainably Accessible Zuidflank Mobility Plan ('Mobiliteitsplan Zuidflank Duurzaam Bereikbaar') was approved in July 2023. This future vision of Zuidas and its surroundings envisages more space for pedestrians, cyclists and public transport – and less for cars. ‘We need a change in the way people travel.’

5 to 17 June: works in Prinses Irenestraat

From 5 to 17 June 2023, we are digging test trenches at different locations in Prinses Irenestraat. Our aim is to map out the underground cables and pipelines. Car traffic will be diverted and we expect some noise nuisance.

Construction traffic to access Kapel & Convict via pontoon

Work is currently in progress on Kapel & Convict in Beatrixpark to prepare for the accommodation of 100 Ukrainian refugees at the end of this year. From the 31 May 2023, construction traffic will be able to access the site by means of a pontoon floating in the pond. This will ensure that the busy cycle path remains free.

Construction starts on art bridge across De Boelegracht

Work started on the art bridge across De Boelegracht in May 2023. We started by placing foundations on the south bank (the Buitenveldert side) in preparation for the real work: installing the bridge later this year.

Parnassusweg closed for two weekends in city direction

Because of construction work, Parnassusweg will be closed to cars and buses travelling in the direction of the city in the last weekend of May and first weekend of June 2023. This will be followed in the summer by a two-month road closure for cars travelling out of the city.

Work in Wielingenstraat continues on the other side

By the end of May, the major maintenance next to the housing in Wielingstraat will be complete. From 29 May until the start of October, it will be the turn of the other side (alongside the RAI). The result will be a safe and green Wielingenstraat.

Diversion in Minervapassage: 5 to 7 May

In the weekend of 5-7 May 2023, there will be a diversion in the Minervapassage, the existing passenger tunnel at Amsterdam Zuid station. This passenger tunnel will be much taller and wider in the future, which is why we are now demolishing part of the existing roof.

Minervabrug: bridge closed for three months for repairs

Starting on 3 April, the bridge for cyclists and pedestrians that connects Zuidas with the Zuid city district will be closed for a three-month period. The Minervabrug is in poor condition and will be repaired. Cyclists and pedestrians will be able to cross the Zuider Amstelkanaal in Beethovenstraat.

Beethovenstraat cycle path next to WTC reopens

The cycle path in Beethovenstraat that runs along the front of the WTC has been open again since 17 March 2023, to the delight of many people. It had been closed for five years to enable the construction of Tower Ten, the newest WTC tower.

How do we keep Zuidas accessible and liveable?

In the Thomaskerk church on 23 March, 2023, we will be presenting the draft Zuidflank Mobility Plan (‘Mobiliteitsplan Zuidflank’). A webinar will then follow on Monday, 27 March. In the plan, we explain how we intend to ensure that the area in and around Zuidas remains accessible and liveable up to 2040. Will you also be attending?

Public space around Tower Ten almost ready

From 13 March until 5 May 2023, we will be completing the work on the public space around WTC Tower Ten. This will include adding an illuminated footpath between Strawinskylaan and Beethovenstraat. In the final week, there will be some traffic disruption.

Liander replaces gas pipeline in Vivaldistraat

In the period from Monday, 6 March until Friday, 10 March, Liander will be replacing a gas pipeline in Antonio Vivaldistraat. Vehicles travelling in a northerly direction will be diverted and the number 464 bus stop will be out of service. There will be little or no disruption for pedestrians and cyclists.