Article archive
Selected filters:
In the new Ravel residential district, something extraordinary is happening. To the south of the AFC football pitches, we are digging a canal: Ravelgracht. The fertile soil that we are removing is set to be reused in other places in Amsterdam.
On the so-called ‘de Boog‘ plot, construction work has started on The CubeHouse. This will be the new head offices of BNP Paribas Nederland and Arcadis. Remarkably, this office tower, developed by G&S&, will mostly be made out of wood.
Starting in September 2023, we will spend a year working on the entrance to the new Ravel residential district: Maurice Ravellaan, with space for pedestrians, cyclists and plenty of green areas. We are also digging an actual canal, complete with bridges to the AFC sports fields.
The cycle path in Beethovenstraat heading in the direction of Valley is again in use. We needed the cycle path in order to carry out work on cables and pipelines and prepare the two plots in the new Ravel residential district for construction. This has now been done.
On 2 June 2023, Circl brought an end to the programming and room hire in the sustainable pavilion in Gustav Mahlerplein. But Circl is now moving online to take an extra step towards a circular economy. The restaurant and rooftop bar will remain open.
Because of construction work, Parnassusweg will be closed to cars and buses travelling in the direction of the city in the last weekend of May and first weekend of June 2023. This will be followed in the summer by a two-month road closure for cars travelling out of the city.
For the development of CubeHouse, permission has been granted to deviate from the zoning plan currently in force. A permit was issued on 5 April 2023 and is now open for consultation for six weeks. The application for planning permission will now also be submitted swiftly.
In the night of 15-16 March 2023, we will be removing two trees in Parnassusweg close to Claude Debussylaan for replanting elsewhere. The trees need to be moved in order to make way for the construction of a new office building on the so-called 'Boog' plot.
In the period from Monday, 6 March until Friday, 10 March, Liander will be replacing a gas pipeline in Antonio Vivaldistraat. Vehicles travelling in a northerly direction will be diverted and the number 464 bus stop will be out of service. There will be little or no disruption for pedestrians and cyclists.
The ‘Sapiens’ creative partnership that was set to become part of Valley is coming to an end. Its initiators, Inholland University of Applied Science, Naturalis Biodiversity Center and Vrije Universiteit Amsterdam (VU Amsterdam), have concluded that the enterprise is not viable.
The crossing over the road and tramlines in Parnassusweg has now been completed. This means that pedestrians heading from Amsterdam Zuid in the direction of VU Amsterdam can now avoid the busy junction between Buitenveldertselaan and De Boelelaan.
From Friday, 2 September until Friday, 21 October 2022, there will be further traffic disruption and potentially also noise nuisance in Beethovenstraat, between Gustav Mahlerlaan and De Boelelaan. This is because of works in preparation for the new Ravel residential district.